
Florence, KY · Electrical Transformer Buyers
Electrical Transformer Buyers in Florence, KY
Florence facility and construction teams call us when equipment is coming out and nobody wants to coordinate an electrician, a rigger and a hauler around one outage window. We are all three, and we pay you for the equipment on top of it instead of charging you to haul it away.
Same-day written offer
Get a Written Offer
Send the asset list, or just describe what is in the room. We come back the same business day with a written, itemized offer.
Faster: call 954-740-1983
Email an asset list to electricalequipmentbuyers@gmail.com
Mon–Sat, 7am–7pm ET. We never resell your contact information.
- Location
- Florence, KY
- Desk
- Electrical Transformer Buyers
- Ratings
- 75 kVA – 50 MVA, oil-filled and dry-ty
- Offer
- Same business day
- Payment
- Before load-out
- Phone
- 954-740-1983
This city
Transformers buyers serving Florence
Our Kentucky routing runs along I-65, I-64, I-71 and I-75, which keeps crew and trailer cost predictable for Florence projects. Coordination with LG&E, Kentucky Utilities, Kenergy, TVA on clearances, metering removal and final disconnect is part of the scope, not a change order.
If the Florence equipment is still carrying load we phase it — dead sections and spares first, distribution as circuits are released, the main line-up on the final clearance. The phasing is written into the offer so nobody improvises in an energized room at two in the morning.
| Item | Detail |
|---|---|
| Ratings | 75 kVA – 50 MVA, oil-filled and dry-type |
| Scope | Pad-mount, dry-type, cast coil, substation |
| Nameplates | ABB, General Electric, Square D, Eaton, Cooper, Howard, Federal Pacific, Siemens, Waukesha, Kuhlman, Westinghouse, Delta Star, Pennsylvania Transformer, Hammond, Acme |
| Condition | Working, retired, water-damaged or already dismantled |
| Minimum | One section, one unit, or a whole plant lot |
Equipment
What we take out of Florence sites
Liquid-filled pad-mount and station class
Oil-filled pad-mount and pole-mount units, loop-feed and radial, unit substations with their primary switching and secondary sections, and station-class power transformers with tap changers, radiators and conservators. Oil is tested for PCB content before anything moves, and the manifests come with your paperwork.
Dry-type and cast coil
Ventilated dry-type and cast-coil units from 15 kVA through 5 MVA, including 480 V to 208 V step-downs, K-rated units specified for harmonic loads, and drive isolation transformers. Dry-types move easily, resell quickly and generally carry a strong number relative to their weight.
Kentucky specifics
Three industries drive Kentucky, and all three are electrically heavy. Automotive assembly at Louisville, Bowling Green and Georgetown runs large MCC and drive installations. Aluminum smelting in the western part of the state uses rectifier transformers and medium-voltage switchgear at a scale most manufacturers never touch. And the distilleries along the bourbon corridor have been expanding and re-powering continuously, which frees up the gear they replaced. The Ohio River corridor from Louisville to Ashland is a route our crews already run.
Nearby
Nearby and related
Nearby Kentucky coverage — crews serving Florence also run to:
Common questions
Florence questions
Do you actually buy electrical equipment in Florence, or just broker it?
We buy it. Southeast Electrical Buyers is the purchaser of record — we fund the purchase, send our own crews to Florence to disconnect and load, and take title when the equipment leaves your dock. There is no third party behind us waiting to approve the price.
What is the smallest job you will take in Florence?
A single transformer, one switchgear section, a pallet of breakers or a few boxes of breakers is worth a call. Because we route crews across Kentucky continuously, small Florence pickups usually get added to an existing run rather than priced as a dedicated trip.
How fast can you get to a Florence site?
Written offers go out the same business day in nearly every case. After acceptance, typical mobilization to Florence is a few business days for a straightforward removal and one to two weeks for a full plant scope that needs phasing, rigging plans or utility coordination.
Do we have to disconnect the equipment before you arrive?
No. We handle removal. Your electrician or the utility performs the final isolation and we verify it; from there our crews lock out, cut and cap cable at the gland, unbolt the sections, skate them out and load them. If the Florence room is still partly live we phase the work.
How do you handle transformer oil in Florence?
Oil is tested, drained and manifested through licensed handlers, and you receive the documentation with your paperwork. PCB-suspect units go under a separate waste profile. Nothing is left on your pad in Florence and nothing gets dumped — the handling cost is already in the offer.
Transformers in Florence?
One call, one written offer, one crew. Payment before the trailer leaves.