Skip to content
Crane lifting a power transformer onto a lowboy trailer while the removal crew guides the load — Poinciana, FL

Poinciana, FL · Electrical Transformer Buyers

We Buy Transformers in Poinciana, FL

Poinciana facility and construction teams call us when equipment is coming out and nobody wants to coordinate an electrician, a rigger and a hauler around one outage window. We are all three, and we pay you for the equipment on top of it instead of charging you to haul it away.

Licensed and insured crewsPayment before load-outOffer in one business day

Same-day written offer

Get a Written Offer

Send the asset list, or just describe what is in the room. We come back the same business day with a written, itemized offer.

Faster: call 954-740-1983
Email an asset list to electricalequipmentbuyers@gmail.com
Mon–Sat, 7am–7pm ET. We never resell your contact information.

Location
Poinciana, FL
Desk
Electrical Transformer Buyers
Ratings
75 kVA – 50 MVA, oil-filled and dry-ty
Offer
Same business day
Payment
Before load-out
Phone
954-740-1983

This city

Transformers buyers serving Poinciana

Poinciana sits in Florida, where FPL, Duke Energy Florida, TECO, JEA feed the load and I-95, I-75, I-4 and the Turnpike carry the freight. Sites near those corridors cost us less to service, and that shows up in your offer rather than in our margin. Miami, Tampa, Orlando and Jacksonville are routine stops and Poinciana work routes with them.

Once an offer is accepted we schedule around your outage, not ours. Night, weekend and phased removals in Poinciana are ordinary work. Crews arrive with their own rigging, lifts and containment, protect the floors and leave the room broom clean.

Equipment we price without hesitation
ItemDetail
Ratings75 kVA – 50 MVA, oil-filled and dry-type
ScopePad-mount, dry-type, cast coil, substation
NameplatesABB, General Electric, Square D, Eaton, Cooper, Howard, Federal Pacific, Siemens, Waukesha, Kuhlman, Westinghouse, Delta Star, Pennsylvania Transformer, Hammond, Acme
ConditionWorking, retired, water-damaged or already dismantled
MinimumOne section, one unit, or a whole plant lot

Equipment

What we take out of Poinciana sites

Liquid-filled pad-mount and station class

Oil-filled pad-mount and pole-mount units, loop-feed and radial, unit substations with their primary switching and secondary sections, and station-class power transformers with tap changers, radiators and conservators. Oil is tested for PCB content before anything moves, and the manifests come with your paperwork.

Dry-type and cast coil

Ventilated dry-type and cast-coil units from 15 kVA through 5 MVA, including 480 V to 208 V step-downs, K-rated units specified for harmonic loads, and drive isolation transformers. Dry-types move easily, resell quickly and generally carry a strong number relative to their weight.

Florida specifics

Florida turns over standby power faster than anywhere else we buy. Every hurricane season pushes hospitals, utilities and data facilities to re-rate their generators and transfer switches, and the sets that come off are often barely run. Phosphate operations around Bartow, sugar and citrus processing below Lake Okeechobee, and the older FPL and Duke Energy Florida generating stations release substation transformers and medium-voltage switchgear alongside them. Port access at Miami, Port Everglades, Tampa and Jacksonville also means export-bound lots can be loaded close to where we buy them.

Common questions

Poinciana questions

Will you take the equipment we cannot sell along with the good items?

Yes, and this is usually why sellers choose us. Cherry-picking leaves you holding the leftovers of the leftovers. We price the Poinciana lot as a whole — good gear, obsolete gear and the scrap fraction together — so the electrical room ends up genuinely empty.

Do you provide documentation for surplus property or audit records?

Yes. Itemized purchase agreements, weight tickets, bills of lading, oil disposal manifests and recycling documentation are standard on Poinciana purchases. Public agencies and audited facilities get the paperwork their process requires without having to ask twice.

Do you actually buy electrical equipment in Poinciana, or just broker it?

We buy it. Southeast Electrical Buyers is the purchaser of record — we fund the purchase, send our own crews to Poinciana to disconnect and load, and take title when the equipment leaves your dock. There is no third party behind us waiting to approve the price.

What is the smallest job you will take in Poinciana?

A single transformer, one switchgear section, a pallet of breakers or a few boxes of breakers is worth a call. Because we route crews across Florida continuously, small Poinciana pickups usually get added to an existing run rather than priced as a dedicated trip.

How fast can you get to a Poinciana site?

Written offers go out the same business day in nearly every case. After acceptance, typical mobilization to Poinciana is a few business days for a straightforward removal and one to two weeks for a full plant scope that needs phasing, rigging plans or utility coordination.

Transformers in Poinciana?

One call, one written offer, one crew. Payment before the trailer leaves.

954-740-1983

Mon–Sat, 7am–7pm ET · Poinciana, FL and statewide

Get a Written Offer