
University, FL · Electrical Transformer Buyers
University, FL Electrical Transformer Buyers
We purchase transformers throughout University and the surrounding Florida market. That includes equipment still energized and scheduled for replacement, equipment already isolated after a shutdown, and whole electrical rooms coming out of a building change. We buy it and we remove it — one offer, one crew, one certificate of insurance.
Same-day written offer
Get a Written Offer
Send the asset list, or just describe what is in the room. We come back the same business day with a written, itemized offer.
Faster: call 954-740-1983
Email an asset list to electricalequipmentbuyers@gmail.com
Mon–Sat, 7am–7pm ET. We never resell your contact information.
- Location
- University, FL
- Desk
- Electrical Transformer Buyers
- Ratings
- 75 kVA – 50 MVA, oil-filled and dry-ty
- Offer
- Same business day
- Payment
- Before load-out
- Phone
- 954-740-1983
This city
Transformers buyers serving University
Florida turns over standby power faster than anywhere else we buy. Every hurricane season pushes hospitals, utilities and data facilities to re-rate their generators and transfer switches, and the sets that come off are often barely run. Phosphate operations around Bartow, sugar and citrus processing below Lake Okeechobee, and the older FPL and Duke Energy Florida generating stations release substation transformers and medium-voltage switchgear alongside them. Port access at Miami, Port Everglades, Tampa and Jacksonville also means export-bound lots can be loaded close to where we buy them. For University specifically that density helps: crews already move through Miami, Tampa, Orlando and Jacksonville, so mobilization is a scheduling question rather than a cost problem.
Once an offer is accepted we schedule around your outage, not ours. Night, weekend and phased removals in University are ordinary work. Crews arrive with their own rigging, lifts and containment, protect the floors and leave the room broom clean.
| Item | Detail |
|---|---|
| Ratings | 75 kVA – 50 MVA, oil-filled and dry-type |
| Scope | Pad-mount, dry-type, cast coil, substation |
| Nameplates | ABB, General Electric, Square D, Eaton, Cooper, Howard, Federal Pacific, Siemens, Waukesha, Kuhlman, Westinghouse, Delta Star, Pennsylvania Transformer, Hammond, Acme |
| Condition | Working, retired, water-damaged or already dismantled |
| Minimum | One section, one unit, or a whole plant lot |
Equipment
What we take out of University sites
Liquid-filled pad-mount and station class
Oil-filled pad-mount and pole-mount units, loop-feed and radial, unit substations with their primary switching and secondary sections, and station-class power transformers with tap changers, radiators and conservators. Oil is tested for PCB content before anything moves, and the manifests come with your paperwork.
Dry-type and cast coil
Ventilated dry-type and cast-coil units from 15 kVA through 5 MVA, including 480 V to 208 V step-downs, K-rated units specified for harmonic loads, and drive isolation transformers. Dry-types move easily, resell quickly and generally carry a strong number relative to their weight.
Florida specifics
Florida turns over standby power faster than anywhere else we buy. Every hurricane season pushes hospitals, utilities and data facilities to re-rate their generators and transfer switches, and the sets that come off are often barely run. Phosphate operations around Bartow, sugar and citrus processing below Lake Okeechobee, and the older FPL and Duke Energy Florida generating stations release substation transformers and medium-voltage switchgear alongside them. Port access at Miami, Port Everglades, Tampa and Jacksonville also means export-bound lots can be loaded close to where we buy them.
Nearby
Nearby and related
Other Florida locations where we buy transformers:
Common questions
University questions
Do you actually buy electrical equipment in University, or just broker it?
We buy it. Southeast Electrical Buyers is the purchaser of record — we fund the purchase, send our own crews to University to disconnect and load, and take title when the equipment leaves your dock. There is no third party behind us waiting to approve the price.
What is the smallest job you will take in University?
A single transformer, one switchgear section, a pallet of breakers or a few boxes of breakers is worth a call. Because we route crews across Florida continuously, small University pickups usually get added to an existing run rather than priced as a dedicated trip.
How fast can you get to a University site?
Written offers go out the same business day in nearly every case. After acceptance, typical mobilization to University is a few business days for a straightforward removal and one to two weeks for a full plant scope that needs phasing, rigging plans or utility coordination.
Do we have to disconnect the equipment before you arrive?
No. We handle removal. Your electrician or the utility performs the final isolation and we verify it; from there our crews lock out, cut and cap cable at the gland, unbolt the sections, skate them out and load them. If the University room is still partly live we phase the work.
How do you handle transformer oil in University?
Oil is tested, drained and manifested through licensed handlers, and you receive the documentation with your paperwork. PCB-suspect units go under a separate waste profile. Nothing is left on your pad in University and nothing gets dumped — the handling cost is already in the offer.
Transformers in University?
One call, one written offer, one crew. Payment before the trailer leaves.